Haha, thanks!
That knee brace or "kicker" is just one of those things. On large barns they're installed way up to the trusses--- my thought on a smaller scale...
Air can still get in but little drying is needed for me. I'm a few years out so I won't be relying on the shed to season wood. The gravel area...
Get a nail bag if you don't have one... I used a lot of old fasterners I had from my grandfather's place. Only bought a few structural screws and...
Partitioning was tricky. I knew I wanted something and knew I should reduce and potential side load on walls. Came up with this: [ATTACH] 5/4...
40ft long, 10ft wide, 9ft 6 to header
Gravel (crusher run) in and around the shed. Dumped by the skiddy and wheelbarrow, rough spread w shovel and rake. No laser here, just rough.
[ATTACH] Purlins/skirts are all rough cut hemlock 2x4s. The base is obviously treated. All measurements taken off the aforementioned level...
[ATTACH] Few types of trim to use if ya want. I had 30ft of this leftover from my pole barn build two years ago. It's meant for the skirt trim but...
[ATTACH] Showing span
The location for the overlap is important. Typically you'd like the overlap to be placed so your predominant wind blows over it. The exception...
You know it! Reason being the extra cost of the floor and the dead weight load required by the wood. Many threads on here and other sites...
I hated tin after this one. Each piece I cut with tin snips rather than a saw... don't ask lol. Some guys measure for the screw holes, I snap...
The front overhang is 3ft ish. The back is 1ft ish. The rafter tails will get 5/4 facia and a gutter later this fall. The front will get a...
Purlins are 5/4 board from the deck. With good quality 2x8 rafters at 2ft center we figured to be good here. Tin was all white on top, but had...
Rafters at 2ft center. Span was under 10. Birds mouth cut into each, tail cut close to proper angle. 2/12 pitch (well, close) [ATTACH] [ATTACH]
My Mennonite buddies helped for setting poles and rafters. Rafters: 14ft rough cut hemlock from a local sawmill. Headers: true 2x12 recovered...
The footprint area was stripped of topsoil and then built up with compacted shale fill. A Kubota svl90 on rent for $28/hr was the ticket. After...
Aftee battling setback codes, getting a variance, and accumulating materials, we could start. I'm lucky enough to have good Mennonite friends...
There are many ways to store and dry wood. I'm an advocate for drying outside and top covering, but I respect any and all opinions. For us, it...