One day of site work done. Topsoil peeled off the lawn and pasture. A little drainage ditch to divert surface water away from a haul road. One of...
The overhead is high, for sure! There will be close to $1,000 in trucking simply to get the excavator, harvester, and forwarder here. Building the...
Today I stripped out a bunch of electric fences and waterlines so they can build the turnaround for the semi’s and the roadway. I’m hoping we have...
The chipping company came and looked at the job. If we build a road and a landing for them beside the pines ( in a wet area), and then pay them...
Well, considerable time has passed, and nothing harvested, but momentum has been regained, and the equipment is beginning to arrive. First up is a...
That’s exciting progress!
Getting quite a bit of seat time doing spring chores. [ATTACH] [ATTACH] [ATTACH] [ATTACH]
Yes, a hand pump (diaphragm type pump, if I recall correctly). It would take several days, and you would know you had done something, but it is...
Thanks - I’ll be ordering one, as I still have a lot to do.
I have a 30 gal leg tank hitched to a pallet that I bring out to where I am working and refill from it.