Specifically western red cedar. For a long time, I've wanted to get rid of this cedar before it causes problems with my septic system. A tree guy...
52 now with a low of 41 predicted overnight. Just lit a load of alder and hemlock in the stove.
Pretty much regarded only good for kindling.
I had a big red cedar cut down yesterday. I already delivered one load to a friend and moved another to my driveway where a friend is gonna pick...
Cedar...yes. Me climbing...NO! I hired a tree service to bring it down.
The 20" bar on my 290 didn't have enough reach to get through the last 2 rounds off the butt end today. So the saw ran with a 25" for about 30...
Plenty of work for the 290 after this morning. [ATTACH] [ATTACH] [ATTACH] [ATTACH]
That's a pretty good testimonial. I got the last one they had in stock and ran almost 2 tanks through it today cutting up branches. [ATTACH] [ATTACH]
With a big mess of limbs to tackle, it might be my time to jump on the 2 saw plan. Lugging my 290 around this mess is a chore. I have stihl pro...
The worst part is that being at the end of the row, he could have parked way to the right at the edge of the grass and been plenty far enough over...
Our state now calls them "incarcerated individuals" or I/I for short. I fully expect them to be residents or clients soon. The Obama...
Not everybody wants or needs a diesel, me included. That truck with the 6.0 is a great worker.
Is that a 6.0 gas engine?
I've never owned one. But I have known a few people with them and I have a real fondness for them. My #1 priority in a rig is reliability.
Says it was a farm truck, so my guess is it was used to move equipment/feed/stuff around a farm. With the price of trucks right now, $3200...
This would be worth looking at. It's 2 hours away from me, otherwise I might actually think about it.[ATTACH] 1989 Ford F250 flatbed - cars &...
Nice addition to a sweet wood truck.
Probably the same people who buy tools and lumber at Lowell's.
One of the things I dislike about hemlock is its inconsistency. Sometimes it's ready in one summer, sometimes it requires 2. Fir is almost always...
I know the dates because I write the month & year on the end of a few splits in each stack, usually with a couple initials for the location.