I finally milled up the second section of pine, the limb came down in the May storm, I ended up with seven eight foot boards that are 1 1/8 thick. So I could get the seven board milled I raised it up some, pic 7998.
http://www.irionlumber.com/uploads/WSN A Simple Approach to Drying Lumber Aug 08.pdf We cover it with a tarp before winter.
http://granberg.com/catalog/granberg-chainsaw-mills/alaskan-mark-iii-c2-series I have the 36 inch with a 5 & 9 foot section of EZ Rails, we also have the mini mill. http://granberg.com/catalog/chainsaw-mill-accessories/chainsaw-mill-accesories
I plan to mill some of this cherry, it has some rot in it but I should get about three or four boards out of it. If the weather is good next weekend I'll take the rails and the mini mill back in, it's up in the air so I plan on milling it where it lies.
Can't wait to see that log opened up, Woody! We milled a nice sized cherry log yesterday (after getting off to a rough start), things went smoothly after lunch. I'll do a post later on about the day's events....
Yes, I'm just very grateful (as was everybody yesterday) that no one was injured.....when that blade hit that log dog I had my back to the mill and was walking away from it.....I heard KABOOOOM, and turned around to shrapnel flying everywhere....that was some of the teeth from the blade... I'm pretty certain it was a faulty bolt which had snapped that let to the headblock falling towards the blade....first thing the blade hit was the log dog.....you should've seen that.... Th really sucky part is that one of the shanks broke off of the blade....the teeth and locks are all replaceable. I don't think that shank can be re-welded onto the blade, and even if that was possible, the blade would have to be hammered and balanced all over again....which I'm sure ain't cheap at all.....