Today is day one of my shed build. I am building a 12'x24' equipment shed this week. I plan on posting my progress daily. Yesterday I went to my buddy's sawmill to pickup some lumber. This guy was a long haul (oversized loads) for many years. He built this sawmill to have something to do when he retires. Well he's retired now and happily milling, even does his own logging. It's an Ireland sawmill made in Norwich NY.
I'm still doing a lot of figurin' on how I'm going to build my shed. I found a guy that has milled down telephone poles into dimensional lumber. I'll get some 4x6's for the corners and some 4x4's for the rest of the posts. I think he has some 2x6's and 2x8's as well that I could potentially use for the rafter supports. I think I have the construction part figured out. I'm having a hard time deciding where to put it.
It's the end of day one. I am really whooped. I am going to add blocking between the floor joists. I still need to square it up and level it better. Tomorrow I hope to put the floor down (rough sawn 1" Hemlock) and maybe stud the back wall.
Wow, you have a lot of energy. Sometimes I get exhausted just thinking about a project I need to get too. When you get done, it will be interesting to see how much $ you have invested besides your time. I hope the weather holds out good for you.
Love the sawmill pic (something near and dear to my heart there), and IMO it's a great feeling to use local lumber.....the trees came from the area, were made into lumber there, and you are supporting a local guy. Win-win there without a doubt. I'm doing basically the same thing with the woodshed I'll be building (starting in spring 2014), I'm harvesting the trees and helping my buddy mill them into boards, and using those boards for my woodshed. So, I guess in the end, all these pines I cut (and I don't burn much of it) are not in vain.... Looking forward to the progress, Jack......looking great so far!!
Jack, that's an ambitious project that should be very rewarding for you. Great job so far. Keep the pics coming.
No, I want to be able to get to all of my blocks around the perimeter so I can adjust them. If I put a block in the middle and it heaves from the frost I won't be able to get to it.
Sounds good. Those joists look to be close on center (16"?) So you should be good. I was just wondering with all the heavy equipment.
Lots of barns with hemlock floors. I was told they put it down green before it has a chance to twist as it dries. Ones down, it become hard and solid and will bare a tremendous amount of weight.