So I have most of my trees I had to take down split and stacked. First time having pine in the stacks. 1.25 cords. A little cooler this past week which made it easier. Cool enough to enjoy some pit time
Back up in the high 80's this week, just have a couple truck loads of needles and clippings to load and haul