After visiting mom at the nursing home I went out back to work on some logs. I got 2 of the logs ratchet strapped and marked on the pallet forks of the mini. It is great to raise the logs to waist height. Got some trigger time on the 254. I love that saw since huskihl put decompression on it for me and I can now start it. The 254 ran out of gas while I was getting the next 2 logs set up. I did not bring any gas with me, but did have the MS 250 along and finished the job. Brought the rounds up to the house and will have at least a couple of hours splitting and stacking. Loaded up the inside rack. I will have to bring in some of the good stuff in. Predicted to be a low of *10 Thursday and *6 Friday. Lowest or darn near that we have seen this year.
I was not there at all. I avoid getting involved in any other contractors work that I did not contract. Owner picked him outside of my scope of work. I did meet him one day when he stopped by to check out my prep work, seemed pretty sharp and knowledgable. I told the owner I did not want to tile because I just had my rotator cuff repaired and felt I would be pushing my limit grouting.
Yeah, that's a pizz poor tile job. Especially from an expensive "professional" Happy Birthday to Sean and ole
Thanks for the birthday wishes everyone. I celebrated it by dropping $460 on a new pipe for my scooter. it’s only money