Donny, I'm wondering if there is any way you can get with the company so they would not come in to chip?
Ive spoken with the pipeline foreman. He stated that they are probably 4-5 months away from coming in and chipping it but that could all change at any moment depending on job availability and what not.
Nice to meet you Donny Price , I don't think anyone has ever joined the club with a mile of wood. I don't think else ever will either. Good luck on getting it while the getting is good.
Welcome Donny Price ! That’s a very score! Hope you can get a good chunk of it before the time runs out.
You need a dump trailer to speed up the process. That's taking a while to load and travel that distance and unload
I would absolutely love to have a dump trailer! Just have to work with what I got at the moment. Ive got a 40 foot flatbed gooseneck, a heavy duty 16 foot flatbed and 2 light duty 8 foot trailers.
Thats something I have never thought about lol. But we have 2 Dodge diesel flatbeds that we pull our trailers with so logistics are pretty well covered.
I know the feeling, we hauled all our logs for 5 years on a 16' flatbed worth sides. Get home, pull logs off one at a time or hope my cousin a mole down the road was home to come unload with his tractor while our tractor was at the job site. We just got our dump trailer in Feb '18.
Weather isn’t cooperating this weekend which really sucks for us. Hope to cut some tomorrow. Went scrounging today and found a pretty good stack I’m going to inquire about tomorrow.