Almost Larry , Sink will get mounted today , do the floor , mount the toilet, so it's looking good that I'll finish on time , I should have some pic's up later , I have a Dr. check up this morning so that makes for a late start .
Most Dr.s check ups are "in and out" , They have a really busy schedule. you are lucky to get 10 or 15 min. with them. I don't mind the short visit time as long as I don't have a long wait time. Nice that your project is moving along. I move so slow that I need 3 times the planned time to get anything done.
I was one of the 1st patients this morning so no long wait , bp was elevated , when they took it a 2nd time dropped 20 pts. , but that is typical for me gave me a script for the shingles vaccine as I'm of that age now routine blood work , we'll see you in a year . Sorry to hijack this thread I'll update project in "what's up " thread.