Should be close to 7 cord in the stack Have about 1-1/2 left to split Plan was to net 7 to 7-1/2 cords when stacked in the shed next Aug. Looks like I have enough. Gonna be some uglies that get culled in Aug & it'll shrink some. 1 or 2 more days & I think Ill be like Locust Post "DONE"
Awesome sir, just a freaking wood hoarders stimulus overload on those pics man...just tremendous friend
You had to tilt the camera to get it all in ah big job well done Dave :stacke::stacke::stacke::stacke::stacke::stacke::stacke::stacke::stacke::stacke::stacke::stacke::stacke::stacke::stacke::stacke::stacke:
You are my hero! I bow down to you o' master of the stacks. I'll never get to that point. But I will dream of your stacks tonight.
Thanks all 35 mph winds coming tomorrow. Snow forecast for Monday, hope to have it all S&S by then 27° now, headed to load the stove .