Just 1 load, log truck.. not even cutting on my property. just using my driveway to access landing as I have only road across swamp
Well 2 week update a dozen log loads out.. apparently only 40 acres who knew Landing Trails A lot of thrashing will be chipped . I request 1 18 wheeler load for low spots the bulldozer will back drag trails the main trails I kept open last 15 years they and landowner like that.. saves time for next time BUT the old landings which is my processing area is taking a beating Double trailer log trucks are heavy and a LOT of rain this year
I know you guys want videos and pics working BUT I am slow and equipment is Not!! really opening the woods up for sunlight A lot of hemlock Soft maple ash cherry birch and elm
Nice pictures Canadian border VT , hopefully they get the trails cleaned up like they were before the job started.
Definitely wet in the woods! Hoping for a dryer fall. In theory, things should dry out a bit this weekend with the wind.
They will; I know because they did last time.. I told farmer he could use driveway if he used “my loggers” I have seen mess others make. They will improve my wood processing area before they leave.. hoping I get wood area re arranged so so dozer can make area for thus
Those big hollow logs are some of my favorites to hand split. Just go right around the edge! Cool it finally worked out for ya
impressive to watch; Mostly hemlock headed to Canada My stone driveway has held up remarkably well to a dozen log trucks a week.
Very cool. I often see log trucks heading up 91….from parts of Mass….up to Canada. Often wondered of the economics of hauling all that distance.
Skier76 I will ask what the rough numbers are but my house to border is less than 20 minutes little less excited them running up and down your driveway you just rebuilt it seems to be holding up pretty well
Brother in f350 dually pulling 24 foot enclosed work trailer met log truck loaded leaving and I missed the picture BUT it was a good one. Brother proved he can reverse.. Drive is 1/4 mile 7% grade on both hills with 100 yards of flat in middle over the swamp with 6’ drop off. 2 ends cannot see other
They would if I asked; I talked to JCMC And other when I re-built driveway it’s holding up fine. Went down 18” laid HD road fabric then 12-14” of 3/4 waited a year to pack, then average 6-8 inches shur pack on top.. I having them clear stump and dozer about another acre of land for a shipping container storage. Then drop me off 6-7 cord firewood ( they have processor) other neighbor owner trucking company I will get another 34 yards of fines on top after they grade. In short let truckers … truck Woodsman work the woods they will also back drag main trails and chip brush on farmers land that I use (don’t build on but I like trails for snow shows, wheelers tractor) and don’t pay taxes on. I can cut down and dead firewood on. It would probably cost me 10 grand or 5 years to clear stump and doze 1.5 acres they will do it while equipment is here in 5 hours.. that’s better than $$