Back we went The big double leader split with a few suggestions with wedge and sledge. Then each side cut to length Then, a-chunkin we went. Load 1. Remains for load 2 Unloading load 2 After raking up the bark and various chunks. It cried Uncle! Final haul That stack is 2 16in courses, about 12ft wide, 6ft high. Plus a short 3rd course to the right. I reckon a cord and 1/3-1/2. Not bad.
Impressive mound of quarters Mike. It was a nice day for wooding. Are those going in the three year rotation?
I'll get it SS'd over time. I'm thinking I'll work it in with 3yr red oak during the 22-23 heating season. There was some punky wood in that final chunk. I'm hoping to be able to split it out, as I split to size. I'll just toss it into the woods.
Well, it was time to move the ash splits I made a couple of months ago. The right third decided to jump into the snow. I had a rack I emptied earlier. I out the rack up on cement pads at each end and the middle. So, bend, grab, lift, move and place 2 hrs later. Just the front rack. Still left to split and move It felt good to be as busy as a one-armed wooder!